8 users, one site, no lost production

Precision manufacturer · multi-site · 8 CUI users

L2CS · November 12, 2026

The situation

A precision manufacturer with more than one location needed to meet CMMC Level 2. Only one site handled CUI, and the engineering work there depended on CAM software tied to a specific workstation and a USB license key.

The challenge

Most enclave designs assume everything can move to a virtual desktop. This shop's CAM setup couldn't, and production could not stop while compliance caught up.

What we did

  • Scoping. We confirmed which site and which people actually touched CUI. The answer was 8 users at one location.
  • Enclave provider selection. We matched the shop with a provider whose design could keep the existing CAM workstation and licensed software working inside the boundary.
  • Policy and training. We wrote policies and an SSP for the real environment and trained the 8 people inside it.

The outcome

  • An 8-user enclave covering one site, with the rest of the business left out of scope.
  • The existing engineering setup was preserved. No production time was lost.
  • Onboarding took about 10 weeks, with an audit-ready target in Q1.

For a small engineering team, the right enclave is the one that fits around the work they already do.